Walk-In Shower Installation

Walk-In Shower Installation Calgary

Frameless or semi-frameless glass, custom tile, and a drain layout that fits your space — installed as a standalone project or part of a full renovation.

Calgary walk-in shower with sage green stacked tile and brushed brass fixtures by Timeless Interiors Ltd

What's included

Every detail of a walk-in shower, planned before we start

Glass style, tile pattern, bench or niche, and drain placement all affect each other — we work through these decisions during your free consultation, not mid-project.

  • Frameless & semi-frameless glass
  • Custom tile walls & floor
  • Linear or center drain
  • Built-in bench seating
  • Recessed niche shelving
  • Waterproof membrane system
  • Fixed-price quote
  • Two-year craftsmanship warranty

Design decisions

What actually shapes a walk-in shower

A walk-in shower is one of the most customizable parts of a bathroom — these are the decisions worth making early.

  1. 01

    Glass style changes the room's whole feel

    Frameless glass reads as more open and modern; a fixed panel with a wider gap costs less. We can show you both during your consultation.

  2. 02

    Linear drains allow a slimmer slope

    A linear drain along one edge lets the floor slope in a single direction, which works well with large-format tile that would otherwise need to be cut for a center drain.

  3. 03

    Niches and benches are easiest to add before tile goes up

    A recessed niche or built-in bench needs to be framed and waterproofed as part of the shower structure — deciding on these upfront avoids a compromise later.

How it works

Your walk-in shower, step by step

The same four-step process as every Timeless Interiors project, applied to your shower specifically.

  1. 1

    Free consultation

    We measure the space, talk through glass and tile options, and settle on drain placement — no charge, no obligation.

  2. 2

    Fixed-price quote

    You receive an itemized quote within 48 hours covering framing, waterproofing, tile, and glass.

  3. 3

    Framing, plumbing & waterproofing

    Drain, framing, and the waterproof membrane all go in before a single tile is set.

  4. 4

    Tile, glass & walkthrough

    Tile, fixtures, and glass go in last, followed by a walkthrough together before we consider it done.

Before your consultation

A few things worth thinking about first

  1. 04

    Grout maintenance is a real long-term cost

    Large-format tile with fewer grout lines costs a bit more upfront but is noticeably easier to keep clean than a mosaic pattern with dense grout lines.

  2. 05

    Water pressure and fixture count should be decided together

    A rain shower head, a handheld wand, and body jets all draw water at once if you want them simultaneously — worth confirming your home's supply can handle it before you commit to a fixture package.

  3. 06

    A bench doesn't have to be built-in

    A teak shower bench or a fold-down seat are lower-cost alternatives to a built-in tiled bench if budget is a bigger factor than the fully custom look.

Common questions

Walk-in shower FAQs

Can I get a walk-in shower installed without renovating the whole bathroom?

Yes — a walk-in shower can be installed as a standalone project, replacing an existing shower or tub without touching the vanity or toilet.

What's the difference between frameless and semi-frameless glass?

Frameless glass uses thicker, unframed panels for a cleaner look and costs more; semi-frameless uses thinner glass with a metal frame around the edges and costs less. Both are fully waterproofed the same way.

Do you install curbless walk-in showers?

Yes, where the existing floor structure allows for it — we assess this during your free consultation.

A walk-in shower is often installed as part of a full bathroom renovation, but works just as well as its own standalone project if the rest of the room is staying the way it is.

Free quote

Ready to talk about your project?

Get a free, no-obligation consultation and a fixed-price quote within 48 hours.

Or send a quick message.

Call nowFree quote